Pending verifications

Items awaiting sign-off from Nate before shipping or finalizing.

๐Ÿ”” Pending Nate verification

Items awaiting Nate sign-off before shipping. Surface in weekly Friday check-ins until resolved.

ItemBlocked onSentStatusNext action
Cluster 1 lead-magnet popup improvementsLula dev resource (popup template) + Kaytlynn replyFlagged 2026-04-27 in Slack to Kaytlynn โ€” no reply sinceCluster 1 (Work Order Chaos) lead magnet IS LIVE; popup UX needs work per Gemma's note to Kaytlynn. Silent for 2+ weeks.Nudge Kaytlynn (or surface on Friday Nate/Gemma sync). Identify which popup library / template Lula's WP uses; spec the better-popup behaviour (trigger, fields, design); decide whether to handle in-skill or as a dev request. Could potentially fold into the broader popup pattern rollout across all 3 cluster lead magnets.
Cluster 2 (Scheduling) lead magnet โ€” final approval + placement on 5 URLsNate sign-off (final asset approval AND placement format)Rebuilt as "Maintenance Scheduler's Efficiency Toolkit"; final approval + placement asks sent to Nate via Slack 2026-05-12Awaiting Nate's reply on BOTH the final asset approval AND placement format. Placement target: 5 Cluster 2 articles (/articles/maintenance-scheduling-software, /articles/how-scheduling-maintenance-saves-time-and-money, /articles/technician-scheduling-software, /articles/sla-tracking, /articles/foresight-vs-manual-processes). Copy (Option 1, Gemma preferred): headline Stop losing hours to scheduling friction / subhead Free toolkit: checklist, KPI tracker, ROI calculator. / button Get the toolkit.Once Nate replies with final approval + placement format (popup vs inline CTA), deploy across the 5 URLs. Closes Cluster 2 lead-magnet substream loop.
Trello card ayCC5XKP (https://trello.com/c/ayCC5XKP) โ€” closes 3rd Foresight cluster loopNate approval + implementationAsked Nate 2026-05-12 via Slack alongside Cluster 2 placement asksPer Gemma's Slack framing: approval + implementation of this card closes the third (and final) Foresight cluster loop. Card content lives in Trello.Await Nate's approval; once approved, implement per card scope. Closes all three Foresight cluster loops (Cluster 1 + Cluster 2 + Cluster 4 lead-magnet/placement workstream).
/foresight customer quote for trust blockNate (he is checking what's available)Asked 2026-04-27 PMNate replied: "Yes โ€” that's a great question I'll see about." Pending.Once Nate returns a usable customer / pilot quote (Renters Warehouse, MMG, Open Door, or other), add a trust block to /foresight between the FAQ and final CTA. Block includes: customer logo, quote, and the 350,000+ properties served stat.
LuMi launch packageNate positioning sign-off2026-04-10 (package built)Awaiting replyLula Day May 8 deadline. Hard external date. Push by 2026-05-01 or ship without.
Property-maintenance-software listicle โ€” performance metricsNate confirmationSent 2026-06-03LuMi-focused rewrite of the Lula section sent to Nate. Three performance metrics (average turnaround, coordination-start time, maintenance time saved) need client confirmation before they go in the published copy. Verified scale numbers (9,000+ network, 50+ markets, 350,000+ properties, 125,000+ work orders in 2025) are in place meanwhile.On Nate's confirmation, add the three metrics and publish the section; otherwise ship the verified-only version.
Core / Core Boost / Core Premium naming finalizationNate decisionOpen since 2026-02-12In fluxConfirm what tier names are current. Affects all product page content.
Make Ready takeaway form (lead magnet)VP of Make Ready sign-offSent prior to 2026-04-24Awaiting reply (Nate following up)Per 2026-04-24 meeting: Nate to push VP again. Blocks lead capture for entire Make Ready cluster.
Help center subdomain SEO fixesLula dev resource (subdomain owner)Spec sent months agoStale, never actionedResend sharper dated nudge to whoever owns the subdomain. Per 2026-04-24 meeting: ~1 day of dev work; site audit health stuck at 79 partly because of these.
/articles blog archive intro copy โ€” WP-edit investigation needed + master style files permission askWP-edit-method discovery (possible Lula dev resource if theme template) + Nate permission to use master style files in ClaudeInvestigation flagged 2026-04-30; permission ask to be raised at Friday 2026-05-15 Nate/Gemma sync/articles archive page is losing rankings. New intro copy locked: Practical guides for property managers running maintenance at scale. From work orders and scheduling to predictive maintenance, software comparisons, make-ready cycles, and vendor management. Written by the Lula team, grounded in what we see across 350K+ properties. Below: latest posts, most-read guides, and our most popular topics. Replaces an Agent A draft that mis-cited topics ("NTE workflows," "SFR portfolio scaling") and used banned voice ("9,000+ contractor network"). Three possible WP-edit paths to investigate: (1) /articles is a Page with a Posts/Query Loop block โ€” paste a Paragraph block at the top; (2) it's a theme-generated archive โ€” edit the Category description in WP admin โ†’ Posts โ†’ Categories; (3) it's a hardcoded template (archive.php/category.php) โ€” needs dev work. Open question carried over from earlier turn (not resolved): intro uses "vendor management" to match published article titles (Vendor Scorecard / Vendor Onboarding / Vendor Compliance Checklist) at the cost of breaking the brand voice rule that says "Pros" not "vendors." Decided to use "vendor management" for page-coherence with article cards. Voice-rule exception logged.(1) Ask Nate at Friday meeting for permission to use the master style files in Claude (blocks the ship if approval needed). (2) Identify which of the three WP cases applies โ€” quickest test is loading /articles/ on the live site and checking whether the WP admin bar offers "Edit Page" or "Edit Category" or nothing. If editable directly: paste copy + ship. If theme-template: spec for dev resource.